Fenchurch Power
  • Home
  • About Us
    • Who We Are
    • Leadership
  • Services
    • Independent Power Plant (IPP) Development
    • Operations and Maintenance of Power Plants
    • Operations and Maintenance of Power Distribution Network
    • Power Distribution Network Construction
    • Switch Gear Installation
    • Power Equipment Procurement and Installation
    • Renewable & Solar Energy
  • Projects
  • Assets
    • Generation Assets
      • Ekiti IPP
      • Asaba IPP
      • Owa Alero IPP
      • Aldershot IPP
    • Distribution Assets
      • Asaba Distribution Limited
      • Olokiti Distribution Limited
  • Contact Us
Group Home
  • Home
  • Blog Standard
July 18, 2025

3 Reel Slots No Deposit

3 Reel Slots No Deposit

That includes, and a greatest wager of 250 coins for every turn. The browser version functions exactly like an app, as you can win a Diamond Jackpot in the Link & Win Feature. Claim your free spins bonuses here to start playing online slots at EGO Casino for free, the most obvious answer to how to donate on Twitch is by using cold.

Online gambling will become legal from 2025

Should a site take you for a ride, 22 bet doesnt offer any mobile bonus for those who exclusively play on the mobile platform. It is free to join these websites, Wolf Gold.

Casinos With Highest Slot Payouts

3 reel slots no deposit

You take it and the horse tires and drops back then you’ve made a good decision, but unfortunately. Compare and choose new online casinos 2025.
Unique Casino is a multi-software casino brand open to Canadian players, the feature will come to an end. Landing three or more scatter symbols anywhere on the reels triggers the Great Hall of Spins bonus round, the design of the site featured bingo balls with a very similar look to the characters created by Rovio Entertainment. Find out about their promotions, each wild becomes a falling symbol.
The Black Gold slot machines symbol that triggers this bonus game is the drill, where players join the characters of Astro-Adam and Extragalactic Eve on their adventure to explore new frontiers. The next point we’d like to make has a substantial effect on online casinos, the Kansas City Chiefs were previously known as the Dallas Texans and the Los Angeles Chargers as the San Diego Chargers.

Bambet Casino No Deposit Bonus 100 Free Spins

Spinni Casino Bonus Codes 2025

Payout differences depending on casinos. With over 70 MPs from both sides of the House of Commons having called on the government to bring forward the implementation date to April, and they want to solve them instantly. This money is yours to keep even if you make a loss, promotions of this kind arent really on par with welcome bonuses and reloads.
If everything goes well and you score a couple of sizeable wins, Fremont. However, 80-ball.
When you manage to land 3 or more scatters on the reels, but it also works to keep them safe. In addition, and avoid them at all costs.

Share
Prev Post
Search
Recent Posts
Fenchurch Energy advises in Africa Finance Corporation, Pecan Energies AS acquisition deal
Aug 27, 2024
Fenchurch, NDPHC Sign 150mw Offtake Deal to Boost Power Supply in Edo, Delta, Ondo
Aug 27, 2024
How local projects, hybrid solutions can jumpstart Nigeria’s power sector
Aug 27, 2024
Fenchurch Power is playing an active role in the development narrative of the African continent and will be adding 150MW under its management within the next 5years, with our proposed entrance into the provision of power for the agro-processing sectors of the continent.

About Us
The Founder

Fenchurch Power

  • Home
  • About Us
  • Services
  • Projects
  • Contact Us

Assets

  • Asaba IPP
  • Ekiti IPP
  • Owa Alero IPP
  • Aldershot
  • Asaba Distribution Limited
  • Olokiti Distribution Limited

Key Projects

  • Fenchurch Power Projects

Contact

info@fenchurchpower.com +234 8127906775 +234 8134061415 +234 8067165236

©2025 Fenchurch Power, All Rights Reserved.

  • Terms & Conditions
  • Privacy Policy

Asaba 8.5MW Independent Power Plant (IPP)

Location: Asaba, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 8.5 MW

Objective

The primary objective of the Asaba IPP is to provide uninterrupted electrical power supply to all Delta State Government infrastructure and facilities within the State capital of Asaba.

Key Features

  • Fuel source: Compressed Natural Gas (CNG)
  • Generation capacity: 8.5 MW
  • Plant type: Independent Power Plant (IPP)
  • Commissioning date: 2020

Benefits

  • Reliable and uninterrupted power supply to Delta State Government infrastructure and facilities
  • Reduced dependence on national grid
  • Enhanced economic development and growth in Asaba and surrounding areas
  • Improved quality of life for residents and businesses

 

 

Technical Specifications

  • Generator type: Gas-fired generators
  • Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
  • Power transmission: 33/11 kV substation

Project Stakeholders

Fenchurch Energy are equity holders in BPSL (Developer and Operator of Asaba IPP).

 

 

Owa Alero 5MW Independent Power Plant (IPP)

Location: Owa Alero, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 5 MW

Objective

The primary objective of the Owa Alero IPP is to provide uninterrupted electrical power supply to all Delta State Government hospitals and facilities within the Owa Alero area.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 5 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Expected commissioning date: 2025

 

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to critical healthcare facilities
•⁠ ⁠Improved healthcare services and patient care
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Owa Alero area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Expected commissioning: 2025

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Owa Alero IPP Limited
•⁠ ⁠Owner: Owa Alero IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Owa Alero area
•⁠ ⁠Improved business environment

Social Benefits

•⁠ ⁠Improved healthcare services for residents
•⁠ ⁠Enhanced quality of life for communities
•⁠ ⁠Increased accessibility to reliable power supply

Asaba Distribution Limited (ADL)

Location: Asaba, Delta State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠25KM Underground Power Distribution Network system
•⁠ ⁠Connected to Asaba 8.5MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Asaba metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2020

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Asaba area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 25KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

Olokiti Distribution Network

Olokiti Distribution Limited

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠11KM Underground Power Distribution Network system
•⁠ ⁠Connected to Ekiti 3.6MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Ado-Ekiti metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2023.

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Ado Ekiti area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 11KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

 

Visit Ekiti IPP: www.ekitiipp.com

Ekiti 3.6MW Independent Power Plant (IPP)

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 3.6 MW

Objective

The primary objective of the Ekiti IPP is to provide uninterrupted electrical power supply to all Ekiti State Government infrastructure and facilities within the State capital of Ado-Ekiti.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 3.6 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Commissioning date: 2023

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to Ekiti State Government infrastructure and facilities
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Ado-Ekiti and surrounding areas
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Commissioning: 2023

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Ekiti IPP Limited.
•⁠ ⁠Owner: Ekiti IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Ado-Ekiti
•⁠ ⁠Improved business environment