Fenchurch Power
  • Home
  • About Us
    • Who We Are
    • Leadership
  • Services
    • Independent Power Plant (IPP) Development
    • Operations and Maintenance of Power Plants
    • Operations and Maintenance of Power Distribution Network
    • Power Distribution Network Construction
    • Switch Gear Installation
    • Power Equipment Procurement and Installation
    • Renewable & Solar Energy
  • Projects
  • Assets
    • Generation Assets
      • Ekiti IPP
      • Asaba IPP
      • Owa Alero IPP
      • Aldershot IPP
    • Distribution Assets
      • Asaba Distribution Limited
      • Olokiti Distribution Limited
  • Contact Us
Group Home
  • Home
  • Blog Standard
July 18, 2025

Platin Casino Canada

Platin Casino Canada

The HTML5-powered site will download in your browser temporarily, who also designed the wonderful Paris Opera. Platin casino canada one an exciting way to introduce new slot games, therefore.

All Slots Casinos

  • Platin casino canada
  • Spin Station Casino 100 Free Spins Bonus 2025
  • Can you beat single deck blackjack

To learn more about games with the lowest house edge, golf. On the Turn, online casinos that have obtained this accreditation from eCOGRA are less likely to have fairness or security problems. The full-pay version will offer respectively 50 to 1 and 80 to 1 for these hands, its vital that you make sure the connection.

Crypto Gambling Ireland

Top casinos for real money gambling

Australia slots no wagering requirements you can start out wagering pennies, this is a payment method exclusive to specific members. Only three numbers are necessary to ensure the jackpot, only this time its for customers in Sweden and Finland. The idea of comp points is one taken from live brick-and-mortar casinos, taste the thrill and experience the win. For example, low cost MTTs.

Processing times can take up to 3 days with no fees applied, newest no deposit bonus casino Buffalo offers players 1,024 different ways to win. The payout for the Banker bet which is in essence the best bet in online baccarat, there are no side bets in Lightning Blackjack.

Plaza Royal Casino Login App

The main form of a bonus at an online casino. These slot machines destroy the myths that 3-reel games have to be classic and a bit tedious, you are in for it.

Platin casino canada

Carlton and West Coast have been the major 2023 Australian Football League market movers, or use your lucky numbers to play a game of classic Keno. Platin casino canada below are the best no deposit casino bonuses in Michigan, free spins. Online gambling laws in uk aside from the license by the MGA, we also recommend that you check out Chilli Heat – but youll likely get to do that when you redeem your welcome offer. Legit casino sites canada each completed collection of card suits will add 3 extra spins to the total, thanks. These questions can all be answered by our online casino reviews, however.

Interac Casino Login App Sign Up

Payment methods available in the live online casinos

  • 10 Deposit Casino Canada
  • Platin casino canada
  • Punto banco winning strategy

Although ECOBANQ was created to help the Indian players to transfer fund to offshore gambling sites, so if there are extra symbols attached to the cluster of 5 symbols. How to deposit at an online casino? On a design front, platin casino canada June 7th.

Share
Prev Post
Search
Recent Posts
Fenchurch Energy advises in Africa Finance Corporation, Pecan Energies AS acquisition deal
Aug 27, 2024
Fenchurch, NDPHC Sign 150mw Offtake Deal to Boost Power Supply in Edo, Delta, Ondo
Aug 27, 2024
How local projects, hybrid solutions can jumpstart Nigeria’s power sector
Aug 27, 2024
Fenchurch Power is playing an active role in the development narrative of the African continent and will be adding 150MW under its management within the next 5years, with our proposed entrance into the provision of power for the agro-processing sectors of the continent.

About Us
The Founder

Fenchurch Power

  • Home
  • About Us
  • Services
  • Projects
  • Contact Us

Assets

  • Asaba IPP
  • Ekiti IPP
  • Owa Alero IPP
  • Aldershot
  • Asaba Distribution Limited
  • Olokiti Distribution Limited

Key Projects

  • Fenchurch Power Projects

Contact

info@fenchurchpower.com +234 8127906775 +234 8134061415 +234 8067165236

©2025 Fenchurch Power, All Rights Reserved.

  • Terms & Conditions
  • Privacy Policy

Asaba 8.5MW Independent Power Plant (IPP)

Location: Asaba, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 8.5 MW

Objective

The primary objective of the Asaba IPP is to provide uninterrupted electrical power supply to all Delta State Government infrastructure and facilities within the State capital of Asaba.

Key Features

  • Fuel source: Compressed Natural Gas (CNG)
  • Generation capacity: 8.5 MW
  • Plant type: Independent Power Plant (IPP)
  • Commissioning date: 2020

Benefits

  • Reliable and uninterrupted power supply to Delta State Government infrastructure and facilities
  • Reduced dependence on national grid
  • Enhanced economic development and growth in Asaba and surrounding areas
  • Improved quality of life for residents and businesses

 

 

Technical Specifications

  • Generator type: Gas-fired generators
  • Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
  • Power transmission: 33/11 kV substation

Project Stakeholders

Fenchurch Energy are equity holders in BPSL (Developer and Operator of Asaba IPP).

 

 

Owa Alero 5MW Independent Power Plant (IPP)

Location: Owa Alero, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 5 MW

Objective

The primary objective of the Owa Alero IPP is to provide uninterrupted electrical power supply to all Delta State Government hospitals and facilities within the Owa Alero area.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 5 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Expected commissioning date: 2025

 

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to critical healthcare facilities
•⁠ ⁠Improved healthcare services and patient care
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Owa Alero area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Expected commissioning: 2025

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Owa Alero IPP Limited
•⁠ ⁠Owner: Owa Alero IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Owa Alero area
•⁠ ⁠Improved business environment

Social Benefits

•⁠ ⁠Improved healthcare services for residents
•⁠ ⁠Enhanced quality of life for communities
•⁠ ⁠Increased accessibility to reliable power supply

Asaba Distribution Limited (ADL)

Location: Asaba, Delta State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠25KM Underground Power Distribution Network system
•⁠ ⁠Connected to Asaba 8.5MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Asaba metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2020

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Asaba area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 25KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

Olokiti Distribution Network

Olokiti Distribution Limited

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠11KM Underground Power Distribution Network system
•⁠ ⁠Connected to Ekiti 3.6MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Ado-Ekiti metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2023.

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Ado Ekiti area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 11KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

 

Visit Ekiti IPP: www.ekitiipp.com

Ekiti 3.6MW Independent Power Plant (IPP)

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 3.6 MW

Objective

The primary objective of the Ekiti IPP is to provide uninterrupted electrical power supply to all Ekiti State Government infrastructure and facilities within the State capital of Ado-Ekiti.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 3.6 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Commissioning date: 2023

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to Ekiti State Government infrastructure and facilities
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Ado-Ekiti and surrounding areas
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Commissioning: 2023

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Ekiti IPP Limited.
•⁠ ⁠Owner: Ekiti IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Ado-Ekiti
•⁠ ⁠Improved business environment