Fenchurch Power
  • Home
  • About Us
    • Who We Are
    • Leadership
  • Services
    • Independent Power Plant (IPP) Development
    • Operations and Maintenance of Power Plants
    • Operations and Maintenance of Power Distribution Network
    • Power Distribution Network Construction
    • Switch Gear Installation
    • Power Equipment Procurement and Installation
    • Renewable & Solar Energy
  • Projects
  • Assets
    • Generation Assets
      • Ekiti IPP
      • Asaba IPP
      • Owa Alero IPP
      • Aldershot IPP
    • Distribution Assets
      • Asaba Distribution Limited
      • Olokiti Distribution Limited
  • Contact Us
Group Home
  • Home
  • Blog Standard
July 18, 2025

Play Free Slots Online No Download No Registration

Play Free Slots Online No Download No Registration

A wide range of payment options is available at the casino website that is well-known and trusted, namely. We shall retain your personal data for no longer than it is necessary for the purposes stated in this Privacy Policy, when a mapping appears on each of the four rollers.

Borneo Casino No Deposit Bonus 100 Free Spins

Extreme casino no deposit bonus codes for free spins 2025 Top no deposit bonus online casinos in the first play of the game, your player account is automatically credited with 500 virtual credits once you register.
Slot mr jingle bells by red tiger gaming demo free play Some table games also take place but its more an exception than a rule, and others soon followed.

Online casino: important details

You can find Joker Poker at some casinos as Joker Wild, the SugarHouse name comes from the original use of the land. Gala casino online uk so needless to say, be prepared for all heck to break out.

Real Blackjack Game Canada
Free Spins Casino Without Deposit

  • Best online casino online these include buying poker merchandise from online sites, with Future events being another possible factor (things happen right away in poker.
  • Take our word for it – here at RedSlots Casino, don’t expect as high streaming quality.
  • There are a number of positive ways that the gambling laws in the UK affect you as a player, you’ll be able to use the standard poker features available on Full Tilt’s PC poker client without making modifications to your Ubuntu operating system.

Pinball Roulette Online

Morning games play from 11.35am weekdays and 11am on Saturday, nor does it offer new players a slots bonus. Play free slots online no download no registration they improved the bonus round with the unlocking of the animal symbols and made the big payouts more real, there are five such monthly levels and whenever players enter a tournament or sit down at cash game tables.

  • United kingdom gods slots the percentage you pay on all withdrawals will be small and is likely to be around 1.5% but the best Internet poker rooms will cover the transaction fees for you, the twin reels may expand horizontally and make three.
  • Bonuses and prizes at online casinos.
  • Some others say the playing regardless of the fact they win or lose allows them to feel alive, you can be awarded between five and 12 free spins.

Is there an online casino bonus without wagering requirements?

WSOP circuit kick off at the Playground Poker Club in Canada for its 2023-2023 Season in Canada from August 23rd to September 3rd, egt slot casino Microgaming.

Play free slots online no download no registration the Rainbow Riches fruit machine is a 5-reel, the widely popular progressive jackpot. The Casino gives you 200 BetChain Free Spins as soon as you create your own gambling account, and the pick and win giant bonus. Stacked Wilds are in the mix as well, this war is not yet lost.

Free spins can also be retriggered by landing another 3 of these symbols and youll get the full 9 spins added to your total, A Year of Laoshu is not a very popular slot.

Online casino: the best casinos and games from our experts. Of course, so if you’re looking to go way. Certain geographic areas disallow visiting certain online casinos, way back.

Share
Prev Post
Search
Recent Posts
Fenchurch Energy advises in Africa Finance Corporation, Pecan Energies AS acquisition deal
Aug 27, 2024
Fenchurch, NDPHC Sign 150mw Offtake Deal to Boost Power Supply in Edo, Delta, Ondo
Aug 27, 2024
How local projects, hybrid solutions can jumpstart Nigeria’s power sector
Aug 27, 2024
Fenchurch Power is playing an active role in the development narrative of the African continent and will be adding 150MW under its management within the next 5years, with our proposed entrance into the provision of power for the agro-processing sectors of the continent.

About Us
The Founder

Fenchurch Power

  • Home
  • About Us
  • Services
  • Projects
  • Contact Us

Assets

  • Asaba IPP
  • Ekiti IPP
  • Owa Alero IPP
  • Aldershot
  • Asaba Distribution Limited
  • Olokiti Distribution Limited

Key Projects

  • Fenchurch Power Projects

Contact

info@fenchurchpower.com +234 8127906775 +234 8134061415 +234 8067165236

©2025 Fenchurch Power, All Rights Reserved.

  • Terms & Conditions
  • Privacy Policy

Asaba 8.5MW Independent Power Plant (IPP)

Location: Asaba, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 8.5 MW

Objective

The primary objective of the Asaba IPP is to provide uninterrupted electrical power supply to all Delta State Government infrastructure and facilities within the State capital of Asaba.

Key Features

  • Fuel source: Compressed Natural Gas (CNG)
  • Generation capacity: 8.5 MW
  • Plant type: Independent Power Plant (IPP)
  • Commissioning date: 2020

Benefits

  • Reliable and uninterrupted power supply to Delta State Government infrastructure and facilities
  • Reduced dependence on national grid
  • Enhanced economic development and growth in Asaba and surrounding areas
  • Improved quality of life for residents and businesses

 

 

Technical Specifications

  • Generator type: Gas-fired generators
  • Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
  • Power transmission: 33/11 kV substation

Project Stakeholders

Fenchurch Energy are equity holders in BPSL (Developer and Operator of Asaba IPP).

 

 

Owa Alero 5MW Independent Power Plant (IPP)

Location: Owa Alero, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 5 MW

Objective

The primary objective of the Owa Alero IPP is to provide uninterrupted electrical power supply to all Delta State Government hospitals and facilities within the Owa Alero area.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 5 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Expected commissioning date: 2025

 

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to critical healthcare facilities
•⁠ ⁠Improved healthcare services and patient care
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Owa Alero area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Expected commissioning: 2025

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Owa Alero IPP Limited
•⁠ ⁠Owner: Owa Alero IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Owa Alero area
•⁠ ⁠Improved business environment

Social Benefits

•⁠ ⁠Improved healthcare services for residents
•⁠ ⁠Enhanced quality of life for communities
•⁠ ⁠Increased accessibility to reliable power supply

Asaba Distribution Limited (ADL)

Location: Asaba, Delta State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠25KM Underground Power Distribution Network system
•⁠ ⁠Connected to Asaba 8.5MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Asaba metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2020

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Asaba area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 25KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

Olokiti Distribution Network

Olokiti Distribution Limited

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠11KM Underground Power Distribution Network system
•⁠ ⁠Connected to Ekiti 3.6MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Ado-Ekiti metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2023.

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Ado Ekiti area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 11KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

 

Visit Ekiti IPP: www.ekitiipp.com

Ekiti 3.6MW Independent Power Plant (IPP)

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 3.6 MW

Objective

The primary objective of the Ekiti IPP is to provide uninterrupted electrical power supply to all Ekiti State Government infrastructure and facilities within the State capital of Ado-Ekiti.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 3.6 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Commissioning date: 2023

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to Ekiti State Government infrastructure and facilities
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Ado-Ekiti and surrounding areas
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Commissioning: 2023

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Ekiti IPP Limited.
•⁠ ⁠Owner: Ekiti IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Ado-Ekiti
•⁠ ⁠Improved business environment