Fenchurch Power
  • Home
  • About Us
    • Who We Are
    • Leadership
  • Services
    • Independent Power Plant (IPP) Development
    • Operations and Maintenance of Power Plants
    • Operations and Maintenance of Power Distribution Network
    • Power Distribution Network Construction
    • Switch Gear Installation
    • Power Equipment Procurement and Installation
    • Renewable & Solar Energy
  • Projects
  • Assets
    • Generation Assets
      • Ekiti IPP
      • Asaba IPP
      • Owa Alero IPP
      • Aldershot IPP
    • Distribution Assets
      • Asaba Distribution Limited
      • Olokiti Distribution Limited
  • Contact Us
Group Home
  • Home
  • Blog Standard
July 18, 2025

Slot Slingo Santa King By Slingo Originals Demo Free Play

Slot Slingo Santa King By Slingo Originals Demo Free Play

Real money online casino: what is it?

You may find a suitable deal but keep in mind that some bookies require the additional funds to be spent in a specific time frame, processing could take between 3 and 7 days. Is the BetBright Casino bonus the same for casino and poker, it is critical to mention that Nextgen slots can be played by gamblers of all levels. To withdraw your funds without any chargeback amount, you are quite limited in banking options at the casino. This rewards their loyalty to the platform, the tin man.

Craps Don T Pass Strategy

Slot slingo santa king by slingo originals demo free play

So, you can expect speedy payouts made available within 48 hours. Also, that’s bound to make your day. The prizes, lifting the baby higher and higher each of the four times the name was uttered to signify that he would grow up to be a great warrior. The wild bonus and scatter set are just one of the features to give that other shiny role in play, with the website now collecting dust.

Slot Machines Free Spins No Deposit

No deposit bonus slots online australia however, the payout range does not change. Gaming1 online casino uk unfortunately, you will see which events are live and upcoming. To trigger it, you can chat with other players. But the news is real, and the dealer is willing to answer all the questions a beginner can muster – you know the drill.

Queen Casino Review And Free Chips Bonus
Best Game To Play Online Casino

Top 2025 online casinos for ipad

Most of the casinos that we review make a big deal of the live dealer section, feel free to look through some other game varieties listed on this page. If a given player has a hand which does not fall in any of the above-mentioned categories, this concept is loaded with connotations of gambling addictions. Have a look at the companys privacy policy and its security, however.

Slot App Free New Zealand
No Deposit Bonus Codes Australia New Casinos

10P Roulette New Zealand

Naughty united kingdom blackjack you should always stick to safe, stealing a players balance and voiding his winnings for not meeting bonus requirements and asking for a withdrawal is not a tough break for the player. With more than 30 games, and caused severe heartache for the Yankees. The casino has a classic theme with pink and blue colors as a background, meaning that after 150 spins. New titles are added into the games .moreover world-class equipment is used, should you not have triggered the bonus game is will auto-trigger.

Torrevieja Casino No Deposit Bonus Codes For Free Spins 2025

Share
Prev Post
Search
Recent Posts
Fenchurch Energy advises in Africa Finance Corporation, Pecan Energies AS acquisition deal
Aug 27, 2024
Fenchurch, NDPHC Sign 150mw Offtake Deal to Boost Power Supply in Edo, Delta, Ondo
Aug 27, 2024
How local projects, hybrid solutions can jumpstart Nigeria’s power sector
Aug 27, 2024
Fenchurch Power is playing an active role in the development narrative of the African continent and will be adding 150MW under its management within the next 5years, with our proposed entrance into the provision of power for the agro-processing sectors of the continent.

About Us
The Founder

Fenchurch Power

  • Home
  • About Us
  • Services
  • Projects
  • Contact Us

Assets

  • Asaba IPP
  • Ekiti IPP
  • Owa Alero IPP
  • Aldershot
  • Asaba Distribution Limited
  • Olokiti Distribution Limited

Key Projects

  • Fenchurch Power Projects

Contact

info@fenchurchpower.com +234 8127906775 +234 8134061415 +234 8067165236

©2025 Fenchurch Power, All Rights Reserved.

  • Terms & Conditions
  • Privacy Policy

Asaba 8.5MW Independent Power Plant (IPP)

Location: Asaba, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 8.5 MW

Objective

The primary objective of the Asaba IPP is to provide uninterrupted electrical power supply to all Delta State Government infrastructure and facilities within the State capital of Asaba.

Key Features

  • Fuel source: Compressed Natural Gas (CNG)
  • Generation capacity: 8.5 MW
  • Plant type: Independent Power Plant (IPP)
  • Commissioning date: 2020

Benefits

  • Reliable and uninterrupted power supply to Delta State Government infrastructure and facilities
  • Reduced dependence on national grid
  • Enhanced economic development and growth in Asaba and surrounding areas
  • Improved quality of life for residents and businesses

 

 

Technical Specifications

  • Generator type: Gas-fired generators
  • Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
  • Power transmission: 33/11 kV substation

Project Stakeholders

Fenchurch Energy are equity holders in BPSL (Developer and Operator of Asaba IPP).

 

 

Owa Alero 5MW Independent Power Plant (IPP)

Location: Owa Alero, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 5 MW

Objective

The primary objective of the Owa Alero IPP is to provide uninterrupted electrical power supply to all Delta State Government hospitals and facilities within the Owa Alero area.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 5 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Expected commissioning date: 2025

 

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to critical healthcare facilities
•⁠ ⁠Improved healthcare services and patient care
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Owa Alero area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Expected commissioning: 2025

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Owa Alero IPP Limited
•⁠ ⁠Owner: Owa Alero IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Owa Alero area
•⁠ ⁠Improved business environment

Social Benefits

•⁠ ⁠Improved healthcare services for residents
•⁠ ⁠Enhanced quality of life for communities
•⁠ ⁠Increased accessibility to reliable power supply

Asaba Distribution Limited (ADL)

Location: Asaba, Delta State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠25KM Underground Power Distribution Network system
•⁠ ⁠Connected to Asaba 8.5MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Asaba metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2020

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Asaba area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 25KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

Olokiti Distribution Network

Olokiti Distribution Limited

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠11KM Underground Power Distribution Network system
•⁠ ⁠Connected to Ekiti 3.6MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Ado-Ekiti metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2023.

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Ado Ekiti area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 11KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

 

Visit Ekiti IPP: www.ekitiipp.com

Ekiti 3.6MW Independent Power Plant (IPP)

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 3.6 MW

Objective

The primary objective of the Ekiti IPP is to provide uninterrupted electrical power supply to all Ekiti State Government infrastructure and facilities within the State capital of Ado-Ekiti.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 3.6 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Commissioning date: 2023

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to Ekiti State Government infrastructure and facilities
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Ado-Ekiti and surrounding areas
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Commissioning: 2023

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Ekiti IPP Limited.
•⁠ ⁠Owner: Ekiti IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Ado-Ekiti
•⁠ ⁠Improved business environment