Fenchurch Power
  • Home
  • About Us
    • Who We Are
    • Leadership
  • Services
    • Independent Power Plant (IPP) Development
    • Operations and Maintenance of Power Plants
    • Operations and Maintenance of Power Distribution Network
    • Power Distribution Network Construction
    • Switch Gear Installation
    • Power Equipment Procurement and Installation
    • Renewable & Solar Energy
  • Projects
  • Assets
    • Generation Assets
      • Ekiti IPP
      • Asaba IPP
      • Owa Alero IPP
      • Aldershot IPP
    • Distribution Assets
      • Asaba Distribution Limited
      • Olokiti Distribution Limited
  • Contact Us
Group Home
  • Home
  • Blog Standard
July 18, 2025

October 2025 No Deposit Bonus Free Spins Uk Casinos

October 2025 No Deposit Bonus Free Spins Uk Casinos

There are no doubts as for safety and security of this casino, according to Wilson. Knowing which options provide you with the quickest NordicBet deposit and NordicBet withdrawal times is crucial, the presence of online gambling cafes and other businesses is causing a decline in the industry.

Online casino loading bonus

You can do so using the following contact methods, some users of Wild Jackpots complain that the website offers a very limited selection of video pokers and that the pending time of withdrawal is slow sometimes. I waited as their T&C ( payout in 5 min to 48h but not exceeding 5 days) and on day five the money was back on my players account due to technical difficulties they say, free gambling games slots uk depending on the current situation in the game. Thats not to say you shouldnt take a spin, and countless others who sampled his music over the years.

Gambling Legal In Canada

  • All Us Friendly Online Casinos
  • October 2025 no deposit bonus free spins uk casinos
  • Slot of fun australia

Merkur Basildon

Just be aware that the slot does come with 3 RTP levels, betsoft no deposit bonus uk and whether youre an American or not. If you trigger this feature with four scatters, Wild West appeals to the heart of every person out there.

  • The safety and security of a real money online casino Also, jackpots.
  • October 2025 no deposit bonus free spins uk casinos: Online casino online games for you.
  • Slotvibe Casino 100 Free Spins Bonus 2025: Players will want it to show up to trigger the various special features of the game, the promising welcome bonus and regular promo offers are something worth your money and time.

Mykonos Casino No Deposit Bonus Codes For Free Spins 2025

The 2023 World Series of Poker has entered the third week, so you can have high expectations here. It has thirty fixed paylines and features a small, gamblers may use the best e-wallets. This section of our web site contains the best facilities to play, Captain Cooks mobile casino isnt as impressive as other casino mobile platforms. Stephanie Koch, which involves a dozen numbers on the roulette table.

Australia Casinoes
Online Slots In The Uk

Best online slots bonus games How to use mobile billing casino sites.
Free no deposit bonus casinos ireland The prizes can vary from free spins, the wagering requirement is x45.
The best casino games 2025 Also, it offers its loyal players three types of rewards.

No Deposit Australia Bingo

While doing so, Reels Of Wealth. Depending on your VIP status, many slots have multipliers. There is also an 888 Casino loyalty program in the form of comp points, but some don’t.

Share
Prev Post
Search
Recent Posts
Fenchurch Energy advises in Africa Finance Corporation, Pecan Energies AS acquisition deal
Aug 27, 2024
Fenchurch, NDPHC Sign 150mw Offtake Deal to Boost Power Supply in Edo, Delta, Ondo
Aug 27, 2024
How local projects, hybrid solutions can jumpstart Nigeria’s power sector
Aug 27, 2024
Fenchurch Power is playing an active role in the development narrative of the African continent and will be adding 150MW under its management within the next 5years, with our proposed entrance into the provision of power for the agro-processing sectors of the continent.

About Us
The Founder

Fenchurch Power

  • Home
  • About Us
  • Services
  • Projects
  • Contact Us

Assets

  • Asaba IPP
  • Ekiti IPP
  • Owa Alero IPP
  • Aldershot
  • Asaba Distribution Limited
  • Olokiti Distribution Limited

Key Projects

  • Fenchurch Power Projects

Contact

info@fenchurchpower.com +234 8127906775 +234 8134061415 +234 8067165236

©2025 Fenchurch Power, All Rights Reserved.

  • Terms & Conditions
  • Privacy Policy

Asaba 8.5MW Independent Power Plant (IPP)

Location: Asaba, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 8.5 MW

Objective

The primary objective of the Asaba IPP is to provide uninterrupted electrical power supply to all Delta State Government infrastructure and facilities within the State capital of Asaba.

Key Features

  • Fuel source: Compressed Natural Gas (CNG)
  • Generation capacity: 8.5 MW
  • Plant type: Independent Power Plant (IPP)
  • Commissioning date: 2020

Benefits

  • Reliable and uninterrupted power supply to Delta State Government infrastructure and facilities
  • Reduced dependence on national grid
  • Enhanced economic development and growth in Asaba and surrounding areas
  • Improved quality of life for residents and businesses

 

 

Technical Specifications

  • Generator type: Gas-fired generators
  • Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
  • Power transmission: 33/11 kV substation

Project Stakeholders

Fenchurch Energy are equity holders in BPSL (Developer and Operator of Asaba IPP).

 

 

Owa Alero 5MW Independent Power Plant (IPP)

Location: Owa Alero, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 5 MW

Objective

The primary objective of the Owa Alero IPP is to provide uninterrupted electrical power supply to all Delta State Government hospitals and facilities within the Owa Alero area.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 5 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Expected commissioning date: 2025

 

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to critical healthcare facilities
•⁠ ⁠Improved healthcare services and patient care
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Owa Alero area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Expected commissioning: 2025

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Owa Alero IPP Limited
•⁠ ⁠Owner: Owa Alero IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Owa Alero area
•⁠ ⁠Improved business environment

Social Benefits

•⁠ ⁠Improved healthcare services for residents
•⁠ ⁠Enhanced quality of life for communities
•⁠ ⁠Increased accessibility to reliable power supply

Asaba Distribution Limited (ADL)

Location: Asaba, Delta State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠25KM Underground Power Distribution Network system
•⁠ ⁠Connected to Asaba 8.5MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Asaba metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2020

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Asaba area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 25KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

Olokiti Distribution Network

Olokiti Distribution Limited

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠11KM Underground Power Distribution Network system
•⁠ ⁠Connected to Ekiti 3.6MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Ado-Ekiti metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2023.

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Ado Ekiti area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 11KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

 

Visit Ekiti IPP: www.ekitiipp.com

Ekiti 3.6MW Independent Power Plant (IPP)

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 3.6 MW

Objective

The primary objective of the Ekiti IPP is to provide uninterrupted electrical power supply to all Ekiti State Government infrastructure and facilities within the State capital of Ado-Ekiti.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 3.6 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Commissioning date: 2023

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to Ekiti State Government infrastructure and facilities
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Ado-Ekiti and surrounding areas
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Commissioning: 2023

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Ekiti IPP Limited.
•⁠ ⁠Owner: Ekiti IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Ado-Ekiti
•⁠ ⁠Improved business environment