Our subsidiary companies offers a broad range of services, including front – end and detailed engineering design, operations and maintenance services, project management and business due diligence. In the infrastructure space, our services include but not limited to the construction and maintenance of power distribution networks, development of Independent Power Plants (IPPs) that provide much needed electricity to residential and large industrial companies. Our diversified range of companies and services allows us draw on a vest network of expertise to deliver innovative commercial and technical solutions to our clients, who range from
governments, international oil companies, international financial institutions and large industrial entities.
Fenchurch Group of companies are Fenchurch Energy Limited, Fenchurch Power Limited and Fenchurch-Michelson (West Africa) Limited; a joint venture with Jaque-Michelson UK. The Fenchurch Group is headquartered in Lagos Nigeria; however our companies operate throughout Nigeria, as well as through overseas representative offices in the (United Kingdom, Ghana, Zambia and Mauritius).

To be a key partner for achieving sustainable energy development in Africa.
Build resilient infrastructure and advance innovative energy solutions for an inclusive and sustainable development of the African Continent.
Advancement Through Enterprise.
01
02
03
04
05
06
07
08
SUSTAINABILITY is at the core of our VISION; at Fenchurch Group, we focus on creating VALUE through the provision of pragmatic SOLUTIONS to the real infrastructure issues currently present on the African continent.
INNOVATION is how we seek to bring about change and shape the infrastructure DEVELOPMENT narrative; our companies are constantly engaging research and applying technical expertise in order to generate long term value to all our stake holders’ clients and in our areas of operations.

Asaba Distribution Limited (ADL)
Location: Asaba, Delta State, Nigeria
Type: Private electricity distribution company
Infrastructure
• 25KM Underground Power Distribution Network system
• Connected to Asaba 8.5MW Independent Power Plant (IPP)
• Serves various load centers and customers within Asaba metropolitan area
Key Features
• Underground cable network for reliable power distribution
• Equipped with Ring Main Units (RMUs) and Transformers
• Provides uninterrupted electrical power supply to load centers
• Commenced operations in 2020
Services
• Electricity distribution to residential, commercial, and industrial customers
• Power supply to critical infrastructure
• Network maintenance and repair
Benefits
• Reliable and uninterrupted power supply
• Reduced power losses and improved efficiency
• Enhanced economic development and growth in Asaba area
• Improved quality of life for residents and businesses
Technical Specifications
• Distribution voltage: 33/11 kV
• Cable type: Underground XLPE cables
• RMU and Transformers
Achievements
• Successfully commissioned 25KM underground distribution network
• Providing uninterrupted power supply to thousands of customers
• Improved power reliability and reduced outages

Owa Alero 5MW Independent Power Plant (IPP)
Location: Owa Alero, Delta State, Nigeria
Type: Compressed Natural Gas (CNG) fired power generation facility
Capacity: 5 MW
Objective
The primary objective of the Owa Alero IPP is to provide uninterrupted electrical power supply to all Delta State Government hospitals and facilities within the Owa Alero area.
Key Features
• Fuel source: Compressed Natural Gas (CNG)
• Generation capacity: 5 MW
• Plant type: Independent Power Plant (IPP)
• Expected commissioning date: 2025




Benefits
• Reliable and uninterrupted power supply to critical healthcare facilities
• Improved healthcare services and patient care
• Reduced dependence on national grid
• Enhanced economic development and growth in Owa Alero area
• Improved quality of life for residents and businesses
Technical Specifications
• Generator type: Gas-fired generators
• Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
• Power transmission: 33/11 kV substation
• Control and monitoring system: Advanced SCADA system
Project Timeline
• Expected commissioning: 2025
Project Stakeholders
• Developer: Fenchurch Power are equity holders in Owa Alero IPP Limited
• Owner: Owa Alero IPP Limited
• Operator: Bremen O&M Limited
Environmental Benefits
• Reduced greenhouse gas emissions
• Lower noise pollution
• Minimal environmental footprint
Economic Benefits
• Job creation during construction and operation
• Increased economic activity in Owa Alero area
• Improved business environment
Social Benefits
• Improved healthcare services for residents
• Enhanced quality of life for communities
• Increased accessibility to reliable power supply

Asaba 8.5MW Independent Power Plant (IPP)
Location: Asaba, Delta State, Nigeria
Type: Compressed Natural Gas (CNG) fired power generation facility
Capacity: 8.5 MW
Objective
The primary objective of the Asaba IPP is to provide uninterrupted electrical power supply to all Delta State Government infrastructure and facilities within the State capital of Asaba.
Key Features
Benefits




Technical Specifications
Project Stakeholders
Fenchurch Energy are equity holders in BPSL (Developer and Operator of Asaba IPP).



Olokiti Distribution Limited
Location: Ado-Ekiti, Ekiti State, Nigeria
Type: Private electricity distribution company
Infrastructure
• 11KM Underground Power Distribution Network system
• Connected to Ekiti 3.6MW Independent Power Plant (IPP)
• Serves various load centers and customers within Ado-Ekiti metropolitan area
Key Features
• Underground cable network for reliable power distribution
• Equipped with Ring Main Units (RMUs) and Transformers
• Provides uninterrupted electrical power supply to load centers
• Commenced operations in 2023.
Services
• Electricity distribution to residential, commercial, and industrial customers
• Power supply to critical infrastructure
• Network maintenance and repair
Benefits
• Reliable and uninterrupted power supply
• Reduced power losses and improved efficiency
• Enhanced economic development and growth in Ado Ekiti area
• Improved quality of life for residents and businesses
Technical Specifications
• Distribution voltage: 33/11 kV
• Cable type: Underground XLPE cables
• RMU and Transformers
Achievements
• Successfully commissioned 11KM underground distribution network
• Providing uninterrupted power supply to thousands of customers
• Improved power reliability and reduced outages


Visit Ekiti IPP: www.ekitiipp.com
Ekiti 3.6MW Independent Power Plant (IPP)
Location: Ado-Ekiti, Ekiti State, Nigeria
Type: Compressed Natural Gas (CNG) fired power generation facility
Capacity: 3.6 MW
Objective
The primary objective of the Ekiti IPP is to provide uninterrupted electrical power supply to all Ekiti State Government infrastructure and facilities within the State capital of Ado-Ekiti.
Key Features
• Fuel source: Compressed Natural Gas (CNG)
• Generation capacity: 3.6 MW
• Plant type: Independent Power Plant (IPP)
• Commissioning date: 2023
Benefits
• Reliable and uninterrupted power supply to Ekiti State Government infrastructure and facilities
• Reduced dependence on national grid
• Enhanced economic development and growth in Ado-Ekiti and surrounding areas
• Improved quality of life for residents and businesses




Technical Specifications
• Generator type: Gas-fired generators
• Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
• Power transmission: 33/11 kV substation
• Control and monitoring system: Advanced SCADA system
Project Timeline
• Commissioning: 2023
Project Stakeholders
• Developer: Fenchurch Power are equity holders in Ekiti IPP Limited.
• Owner: Ekiti IPP Limited
• Operator: Bremen O&M Limited
Environmental Benefits
• Reduced greenhouse gas emissions
• Lower noise pollution
• Minimal environmental footprint
Economic Benefits
• Job creation during construction and operation
• Increased economic activity in Ado-Ekiti
• Improved business environment