KEY EXECUTED PROJECTS

  • Home
  • Fenchurch Power Projects

Power Holding Company of Nigeria

Engineering, Procurement, Installation, and Commissioning of 2 x 15MVA Injection Substation (Civil and Electromechanical Works) Ilesa, Osun State
(>$2million)

Fenchurch Power

(Completed)
2012

British American
Tobacco

Supply and Installation of a 4.6mw Diesel Generator
(>$1.5million)

Fenchurch Power

(Completed)
2014

BPS
Limited

Power Audit and Load Studies of the Proposed 8.5MW Asaba Independent Power Plant
(>$1million)

Fenchurch Power
(Completed)
2016

Asaba Distribution Limited

Conceptual and Front-End Engineering Design of the 11kv 25km Underground Distribution Network
(>$1million)

Fenchurch Power
(Completed)
2016
BPS
Limited

Promoters of the Development of the 8.5MW Asaba Independent Power Plant
(>$9million)

Fenchurch Power

(Completed)
2016

Olokiti Power Distribution Limited

Conceptual and Front-End Engineering Design of the Olokiti 11kv 12km Underground Distribution Network
(<$200,000)

Fenchurch Power

(Completed)
2016

Asaba Distribution Limited

Promoters of the Development of the Asaba 11kv 25km Underground Distribution Network
(>$3million)

Fenchurch Power

(Completed)
2019

Ekiti IPP
Limited

Power Audit and Load Studies of the Proposed 5MW Ekiti Independent Power Plant
(<$200,000)

Fenchurch Power

(Completed)
2021

(WAEP) &
NLNG

Supply, Installation and Commissioning of MV Packaged Substations
(>$250,000)

Fenchurch Power

(Completed)
2021

Ekiti Ipp
Limited

Developers of the 5MW Ekiti Independent Power Plant
(>$6million)

Fenchurch Power

(Completed)
2023

Olokiti Power Distribution Limited

Developers of the Olokiti 11kv 11km Underground Distribution Network
(>$3million)

Fenchurch Power

(Completed)
2023

Ikeja
Electric

Supply of 500kVA 11/.400kV transformers
(< ₦150 million)

Fenchurch Power

(Completed)
2024

Eko Electricity Distribution Company

Engineering, Procurement, Installation of 11kV overhead distribution network (Civil and Electromechanical Works) Badore, Ajah, Lagos State

Fenchurch Power

(Ongoing)
2024