Fenchurch Power
  • Home
  • About Us
    • Who We Are
    • Leadership
  • Services
    • Independent Power Plant (IPP) Development
    • Operations and Maintenance of Power Plants
    • Operations and Maintenance of Power Distribution Network
    • Power Distribution Network Construction
    • Switch Gear Installation
    • Power Equipment Procurement and Installation
    • Renewable & Solar Energy
  • Projects
  • Assets
    • Generation Assets
      • Ekiti IPP
      • Asaba IPP
      • Owa Alero IPP
      • Aldershot IPP
    • Distribution Assets
      • Asaba Distribution Limited
      • Olokiti Distribution Limited
  • Contact Us
Group Home
  • Home
  • Blog Standard
  • News & Updates
  • How local projects, hybrid solutions can jumpstart Nigeria’s power sector
News & Updates
August 27, 2024

How local projects, hybrid solutions can jumpstart Nigeria’s power sector

Electricity is the backbone of modern society, driving everything from homes and businesses to industries and government services. A reliable power supply is essential for a nation’s growth and prosperity.

However, Nigeria’s power sector faces significant challenges, including inadequate funding, ageing infrastructure, regulatory obstacles, and operational inefficiencies. Olufemi Bakare, group chief executive officer of Fenchurch Group, in this interview with Abubakar Ibrahim, energy reporter at BusinessDay, discusses challenges in Nigeria’s power sector, solutions, and the low-hanging fruit in metering, generation, and local content.

Can you give us an overview of Fenchurch Group’s involvement in Nigeria’s power sector?

Fenchurch Group operates through its subsidiary, Fenchurch Power, which develops and manages independent power plants (IPPs). We own an 8.5 megawatts (MW) plant and a 25-kilometre underground distribution network in Asaba, Delta State.

Additionally, we have a 3.6 MW IPP in Ado Ekiti with an 11-kilometre network and are developing an 8 MW plant in Otta, Ogun State, as well as a 5 MW project in Ohalera, Delta State. We also own Fenchurch Energy, which provides consulting services in both the oil and gas sectors, as well as advisory support for power projects.

From your experience, what are the biggest challenges facing Nigeria’s power sector?

One major challenge is funding. These projects are capital-intensive, and access to foreign exchange (forex) is critical since much of the equipment is imported. While the government has improved policies through NERC, there is still a large infrastructure gap. We need a stronger financial sector to move things forward more quickly.

Could you describe some specific obstacles Fenchurch Power has encountered and how they were managed?

During our Asaba project, the main hurdles were administrative and regulatory. Engineering is only about 40 percent of the job—the rest is navigating permits, power purchase agreements, exco approvals, and house of assembly ratifications.


We faced similar challenges in securing funding and political risk. For instance, on an 8 MW project in Ogun State, funders requested we hire an international consultant, which was an overreach considering the project’s scale. We pushed back and found a local expert instead.

Lack of local expertise is also a recurring issue, especially when funders don’t fully understand Nigeria’s operating environment.

However, through continuous stakeholder engagement and better project structuring, we’ve been able to address these issues and move forward.

What opportunities do you see for growth in Nigeria’s power sector?

The opportunities are vast. There’s a huge demand for additional generation and distribution capacity, especially given the frequent grid collapses and stranded power across the country.
Decentralised, localised generation is one area with immense potential. There’s also growing interest in software solutions, where consumers can track and manage their electricity usage in real-time.

Equipment supply and financing also present promising opportunities, particularly as technology continues to integrate with the power sector.

What could the government do better to improve power generation and distribution?

The government, through the minister of power, is making some progress, especially with tariff reviews and efforts to ramp up capacity. However, power is still largely subsidised, which deters investment.

The Transmission Company of Nigeria (TCN) remains a bottleneck, with a lot of stranded power across the grid. TCN needs to step up its game, and while the government is funding improvements, these projects take time.

Gas infrastructure is also critical. Many power plants are not receiving adequate gas supply, which is why the government’s push for more gas pipelines is a great initiative.

Compressed natural gas (CNG) is another area with huge potential, especially with the removal of petrol subsidies. The customs process for importing equipment is another pain point. Delays at the ports slow down infrastructure projects significantly, so that’s an area where greater efficiency is needed.

How do you see the private sector contributing to solving Nigeria’s power challenges?

The private sector is already at the forefront. Companies like Fenchurch Power, Utilita, and ElectronNigeria are driving localised power generation and distribution.

In the past, distribution companies (Discos) viewed us as competition, but now there’s a shift towards collaboration. We’re being invited to be embedded partners, supplying power to commercial clients.

Our pricing is competitive—cheaper than diesel but more expensive than Band A tariffs due to the cost of CNG. We target large commercial customers and have recently begun selling night loads to hotels in Ekiti. This relieves the grid, as we provide dedicated power for critical services like hospitals and schools.

What is Fenchurch Group doing to impact local communities?

We’re committed to Corporate Social Responsibility (CSR). For instance, during our power plant development in Ekiti, we sourced all materials locally and employed local artisans, promoting skills transfer.

We also established Bremen Operations and Maintenance Limited to manage our power plants and provide training for local engineering graduates. Additionally, we supply power to local government schools and healthcare facilities, ensuring access to reliable electricity.

What’s the future of renewables in Nigeria’s power sector?

Renewables will play a significant role, but challenges remain, particularly with storage costs. As battery production becomes more localised, costs will decrease, making renewable energy more viable.

We’re optimistic about the role renewables will play in complementing Nigeria’s energy mix soon.

How can Nigeria’s energy consumption become more efficient?

We need better enforcement of building permits and zoning regulations. For example, streets designed for residential use often end up hosting commercial enterprises like nightclubs and supermarkets, which overload existing transformers. We all have a part to play—developers, government, and the public—in making the power sector more efficient.

How is Fenchurch Group approaching renewable energy in Nigeria?

We are working to expand our renewable energy footprint. While our plants primarily run on gas, a clean energy source, we’re now introducing hybrid solutions that combine solar and gas.

For example, we’re negotiating with an industrial client to use solar for non-essential loads like lighting and administrative tasks, while gas would power the heavy machinery. This hybrid model is something we’re looking to expand.

How crucial are partnerships and collaborations for power projects?

Partnerships are essential because power projects are capital-intensive. Sharing the risk makes sense. We regularly engage with financial institutions like Stanbic Infrastructure Fund, United Capital, and Chapel Hill.

Equipment suppliers and local communities are also critical stakeholders, as we need their support to maintain security and prevent power theft or vandalism. Choosing the right partners is crucial; we avoid charlatans who could derail projects.

What is your vision for the future of Nigeria’s power sector, and how does Fenchurch fit in?

The future is bright, with access to electricity being key to national development. Energy security is vital, as even healthcare depends on reliable power. Fenchurch Power aims to be a major player in this space.

We’re planning to develop a gas pipeline and compression station to ensure a steady supply for our plants. We’re also open to working with other stakeholders like PowerGen, American Towers, and Oando Clean Energy to support the country’s industrialisation.

Consumers, Corporate, Funds, Growth
Share
Prev Post Next Post
Search
Recent Posts
Fenchurch Energy advises in Africa Finance Corporation, Pecan Energies AS acquisition deal
Aug 27, 2024
Fenchurch, NDPHC Sign 150mw Offtake Deal to Boost Power Supply in Edo, Delta, Ondo
Aug 27, 2024
Power and Internet of Things: Energy Efficiency as catalyst for Technological Innovation and Economic Growth in Nigeria.
Dec 26, 2023
Fenchurch Power is playing an active role in the development narrative of the African continent and will be adding 150MW under its management within the next 5years, with our proposed entrance into the provision of power for the agro-processing sectors of the continent.

About Us
The Founder

Fenchurch Power

  • Home
  • About Us
  • Services
  • Projects
  • Contact Us

Assets

  • Asaba IPP
  • Ekiti IPP
  • Owa Alero IPP
  • Aldershot
  • Asaba Distribution Limited
  • Olokiti Distribution Limited

Key Projects

  • Fenchurch Power Projects

Contact

info@fenchurchpower.com +234 8127906775 +234 8134061415 +234 8067165236

©2025 Fenchurch Power, All Rights Reserved.

  • Terms & Conditions
  • Privacy Policy

Asaba 8.5MW Independent Power Plant (IPP)

Location: Asaba, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 8.5 MW

Objective

The primary objective of the Asaba IPP is to provide uninterrupted electrical power supply to all Delta State Government infrastructure and facilities within the State capital of Asaba.

Key Features

  • Fuel source: Compressed Natural Gas (CNG)
  • Generation capacity: 8.5 MW
  • Plant type: Independent Power Plant (IPP)
  • Commissioning date: 2020

Benefits

  • Reliable and uninterrupted power supply to Delta State Government infrastructure and facilities
  • Reduced dependence on national grid
  • Enhanced economic development and growth in Asaba and surrounding areas
  • Improved quality of life for residents and businesses

 

 

Technical Specifications

  • Generator type: Gas-fired generators
  • Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
  • Power transmission: 33/11 kV substation

Project Stakeholders

Fenchurch Energy are equity holders in BPSL (Developer and Operator of Asaba IPP).

 

 

Owa Alero 5MW Independent Power Plant (IPP)

Location: Owa Alero, Delta State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 5 MW

Objective

The primary objective of the Owa Alero IPP is to provide uninterrupted electrical power supply to all Delta State Government hospitals and facilities within the Owa Alero area.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 5 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Expected commissioning date: 2025

 

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to critical healthcare facilities
•⁠ ⁠Improved healthcare services and patient care
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Owa Alero area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Expected commissioning: 2025

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Owa Alero IPP Limited
•⁠ ⁠Owner: Owa Alero IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Owa Alero area
•⁠ ⁠Improved business environment

Social Benefits

•⁠ ⁠Improved healthcare services for residents
•⁠ ⁠Enhanced quality of life for communities
•⁠ ⁠Increased accessibility to reliable power supply

Asaba Distribution Limited (ADL)

Location: Asaba, Delta State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠25KM Underground Power Distribution Network system
•⁠ ⁠Connected to Asaba 8.5MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Asaba metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2020

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Asaba area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 25KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

Olokiti Distribution Network

Olokiti Distribution Limited

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Private electricity distribution company

Infrastructure

•⁠ ⁠11KM Underground Power Distribution Network system
•⁠ ⁠Connected to Ekiti 3.6MW Independent Power Plant (IPP)
•⁠ ⁠Serves various load centers and customers within Ado-Ekiti metropolitan area

Key Features

•⁠ ⁠Underground cable network for reliable power distribution
•⁠ ⁠Equipped with Ring Main Units (RMUs) and Transformers
•⁠ ⁠Provides uninterrupted electrical power supply to load centers
•⁠ ⁠Commenced operations in 2023.

Services

•⁠ ⁠Electricity distribution to residential, commercial, and industrial customers
•⁠ ⁠Power supply to critical infrastructure
•⁠ ⁠Network maintenance and repair

Benefits

•⁠ ⁠Reliable and uninterrupted power supply
•⁠ ⁠Reduced power losses and improved efficiency
•⁠ ⁠Enhanced economic development and growth in Ado Ekiti area
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Distribution voltage: 33/11 kV
•⁠ ⁠Cable type: Underground XLPE cables
•⁠ ⁠RMU and Transformers

Achievements

•⁠ ⁠Successfully commissioned 11KM underground distribution network
•⁠ ⁠Providing uninterrupted power supply to thousands of customers
•⁠ ⁠Improved power reliability and reduced outages

 

Visit Ekiti IPP: www.ekitiipp.com

Ekiti 3.6MW Independent Power Plant (IPP)

Location: Ado-Ekiti, Ekiti State, Nigeria

Type: Compressed Natural Gas (CNG) fired power generation facility

Capacity: 3.6 MW

Objective

The primary objective of the Ekiti IPP is to provide uninterrupted electrical power supply to all Ekiti State Government infrastructure and facilities within the State capital of Ado-Ekiti.

Key Features

•⁠ ⁠Fuel source: Compressed Natural Gas (CNG)
•⁠ ⁠Generation capacity: 3.6 MW
•⁠ ⁠Plant type: Independent Power Plant (IPP)
•⁠ ⁠Commissioning date: 2023

Benefits

•⁠ ⁠Reliable and uninterrupted power supply to Ekiti State Government infrastructure and facilities
•⁠ ⁠Reduced dependence on national grid
•⁠ ⁠Enhanced economic development and growth in Ado-Ekiti and surrounding areas
•⁠ ⁠Improved quality of life for residents and businesses

Technical Specifications

•⁠ ⁠Generator type: Gas-fired generators
•⁠ ⁠Fuel handling system: Compressed Natural Gas (CNG) storage and handling facility
•⁠ ⁠Power transmission: 33/11 kV substation
•⁠ ⁠Control and monitoring system: Advanced SCADA system

Project Timeline

•⁠ ⁠Commissioning: 2023

Project Stakeholders

•⁠ ⁠Developer: Fenchurch Power are equity holders in Ekiti IPP Limited.
•⁠ ⁠Owner: Ekiti IPP Limited
•⁠ ⁠Operator: Bremen O&M Limited

Environmental Benefits

•⁠ ⁠Reduced greenhouse gas emissions
•⁠ ⁠Lower noise pollution
•⁠ ⁠Minimal environmental footprint

Economic Benefits

•⁠ ⁠Job creation during construction and operation
•⁠ ⁠Increased economic activity in Ado-Ekiti
•⁠ ⁠Improved business environment